Catalog

Installing doors in London - Ref: 9906

Installing doors in London - Ref: 9906 photo 1
Installing doors in London - Ref: 9906 photo 1
Foto

Get a loan for renovation from 3.5%

Service Availability
England London

Such installation works in London begin with a study of the geometry of the openings, then specify the direction of opening the doors (if there are no agreed plans) and inspect the components for defects. The supervisor is informed of all defects found. After finishing the finishing work, the door blocks are installed in London on the finished floor covering using adhesive foam. The alignment of the thresholds and baseboards is done after the installation of the platbands. When mounting the door blocks, the finished finish must not be damaged.

A gap of no more than 10 mm is allowed between the floor covering and the end of the door leaf. In this case, the floor should be leveled beforehand. The gaps should be the same along the perimeter of the door leaf when closed. As soon as the manager accepts the project, the work is considered completed.

Negotiable price
Ref: 9906
3/318

Ask the seller

Find out price
Personal manager needed
Get a discount
Call Message
DiscountHouse
Hello! Ready to help you. Write to me if you have any questions.