Catalog

Finishing works in London - Ref: 9901

Finishing works in London - Ref: 9901 photo 1
Finishing works in London - Ref: 9901 photo 1
Foto

Get a loan for renovation from 3.5%

Service Availability
England London

The walls in an apartment in London are erected before the screed is poured to ensure better sound insulation. Before plastering, it is necessary to prime the walls with a deep penetration primer. If the plastering of the walls will take place in several stages, then it is necessary to prime after each layer. The walls are plastered both with and without lighthouses.

Plastering the walls in a London apartment using lighthouses, we get the correct wall geometry, i.e. the walls will be strictly vertical and adjacent to each other at the necessary angles. It is necessary to set up lighthouses using a laser level, finding the most prominent point on the wall (the zero point). The thickness of the applied plaster layer, as a rule, should not exceed 5 cm. The maximum and minimum allowable layers are indicated on the bags with the mixture. After applying the plaster, the lighthouses are removed because they rust from moisture and subsequently appear on the finish.

The struts from the lighthouses are sealed with mortar. Before filling walls in London apartments, it is also necessary to prime the surface. After filling, the walls must be sanded with fine-grained sandpaper. The floor arrangement, depending on the client's wishes, is carried out using various technologies. This can be a plywood floor on logs, a board floor, a wet or semi-dry screed, etc. Often a self-leveling mixture (self-leveling floor) is poured onto the screed to smooth the surface. The installation of floor coverings, depending on the type, requires preliminary preparation.

A special substrate is laid under the laminate. It can be made of both natural materials (cork) and artificial (expanded polystyrene). Damping gaps are left at the edges (in the case of a floating coating). The construction of structures and partitions made of hot water heaters is accompanied by their sound insulation and thermal insulation. If necessary, inspection hatches are provided.

The HVL joints are reinforced with a bandage tape, putty and plastered with appropriate solutions. Stretch ceilings and other ceilings are installed after the electrical wiring is removed along the ceilings and prepared walls. Reinforced mortgages should be provided for heavy chandeliers and lamps. The doors must be installed using high-quality and professional tools. The presence of backlashes is unacceptable on the miter saw required for cutting platbands at an angle of 45 degrees.

Negotiable price
Ref: 9901
3/264

Ask the seller

Find out price
Personal manager needed
Get a discount
Call Message
DiscountHouse
Hello! Ready to help you. Write to me if you have any questions.