Over time, our homes naturally suffer from the everyday wear and tear of normal family life — the decor becomes a little tired and faded — the kitchen that looked so modern when you first moved in now looks outdated — and the bathroom is on its last legs. The solution is a refresh. At DH - Dubai, we have a team of dedicated home improvement design specialists who can work with you to transform your home from top to bottom or simply focus on making one room that needs attention.
All Types of Renovation and Reconstruction in Dubai
We can design and build any space, carry out cosmetic renovation in Dubai, UAE, knock through walls to create one larger living space, reposition and/or build new walls. We can renovate kitchens and bathrooms, as well as supply and install a full range of ceramic tiles, marble floors, new ceilings, doors, and arches, lighting, and staircases. No home improvement can be too large or too small, from adding an entire floor to your villa to hanging a few paintings on the walls. Our team of professional craftsmen covers the full spectrum of trades, from plumbing to electrical work. Whatever the job, we have it at DH.
What This Is
Turnkey renovation is a full cycle of work in which the client receives a finished space without the need to coordinate individual contractors. The service covers design, demolition, engineering systems, finishing, and final cleaning. This format is in demand for both apartments in residential complexes and villas in gated communities. Pricing is calculated individually for each property.
What Types of Renovation Exist
Cosmetic renovation — updating without altering structures. It includes painting walls and ceilings, replacing flooring, installing new light fixtures and outlets, replacing interior doors, and updating plumbing fixtures without relocating pipes. Suitable for preparing a property for rent or sale.
Major renovation — includes reconfiguration with demolition and construction of walls, full replacement of wiring and pipes, waterproofing of wet areas, and replacement of floor screed and ceiling structures.
Turnkey renovation — full cycle: design project, demolition, engineering networks, finish work, furnishing, final cleaning.
Reconstruction — altering load-bearing structures: cutting openings, combining spaces, adding floors to a villa, converting non-residential areas.
What the Work Includes
-
Design and 3D visualization
-
Demolition of old finishes and structures
-
Construction and relocation of walls and partitions
-
Full replacement or relocation of electrical systems
-
Installation and replacement of plumbing
-
Waterproofing of bathrooms and kitchens
-
Laying tiles, marble, and porcelain stoneware
-
Installation of stretch and drywall ceilings
-
Installation of doors, arches, and staircases
-
Installation of lighting and outlet groups
-
Painting and plastering work
-
Final cleaning and removal of construction debris
Materials and Technical Details
Waterproofing — epoxy grouts resistant to mold and discoloration are used in bathrooms. In areas with a high groundwater level, liquid rubber is used.
Walls — moisture-resistant gypsum mixes are used to prevent condensation and mold forming under the finish.
Partitions — built from aerated concrete blocks or drywall with a mandatory technical gap for air circulation.
Electrical — work is carried out according to DEWA standards (based on the 17th edition of IET regulations, adapted to Dubai's climate). Each circuit is protected by a circuit breaker, and a residual current device (RCD) must be installed. Cable cross-section is calculated with a reserve for modern loads.
Thermal insulation — materials are selected from the list approved by the Dubai Municipality, such as Knauf mineral wool boards (registration codes 06.079.01–06.079.11).
Water supply — PEX pipes for water supply, plastic pipes for drainage. A rainwater harvesting system for irrigation can be installed.
Kitchen surfaces — quartz stone is recommended for Dubai's climate: it is non-porous and resistant to stains, heat, and moisture.
Flooring — ceramic and porcelain stoneware tiles, engineered wood, marble, SPC/vinyl. Natural stone and ceramics are recommended: they are resistant to moisture and stay cool.
Timelines
Cosmetic renovation — 2–4 weeks.
Turnkey renovation, 2-bedroom apartment — 4–8 weeks.
Villa renovation — 8–14 weeks for a detached villa, 6–10 weeks for a townhouse.
Permits and Regulators
Structural changes require a permit from the Dubai Municipality. In gated communities, a NOC must be obtained from the master developer. Increasing electrical load, new water connections, air conditioning modifications, installation of solar panels, and EV chargers require approval from DEWA.
Where We Operate
Services are provided in Dubai, including the areas of Marina, JBR, Downtown, Business Bay, JVC, Jumeirah, Deira, Bur Dubai, Dubai Hills, Palm Jumeirah, Silicon Oasis, and Arjan. Work is carried out in apartments, villas, townhouses, and offices.
This Is a Good Fit For
-
Owners of apartments and villas who need a full renovation cycle without coordinating contractors
-
Preparing a property for rent or sale
-
Reconfiguration with combining or dividing spaces
-
Reconstruction with adding a floor to a villa
-
Updating a single room — kitchen, bathroom, or living room
This May Not Be a Good Fit For
-
Properties outside the Emirate of Dubai if the visit has not been coordinated
-
Work without full access to the property, water, and electricity
-
Projects requiring materials not available in the UAE
-
Structural changes without a municipality permit and developer NOC
-
Work not coordinated with DEWA when increasing load
What to Confirm Before Booking
-
Area of the premises and number of rooms
-
Area and name of the residential complex
-
Whether a design project is needed
-
Whether reconfiguration with wall demolition is required
-
Whether replacement of electrical, plumbing, or air conditioning systems is needed
-
Whether there are restrictions from the management company or developer
-
Desired start and completion dates
-
Whether furnishing and final cleaning are needed
Important Information
Proposals are delivered by email. Once you accept the proposal, the fee will be charged according to the payment plan specified in the proposal.
Please note that all work requires full access to the property, as well as free use of domestic water and access to electricity where necessary.
We may use a registered and approved subcontractor specializing in such services.
Details and materials are subject to availability in the UAE.